AIM
  • To make a cable arrangement in every each of port.
  • To try more versatile feature and display.

RESULTS
  • At the figure 1, to make a cable more structured, an arrangement of cable need to do it. Flexible cable hose has been choose to make an arrangement for this cable. To complete this task, around 3-5m flexible cable hose has been used.
  • At the figure 2, after all the arrangement cable have done, the labeling process will take as a next step. Labeling process is an important thing for this project to make sure the structure of coding is equal in every port of PIC.
  • At the figure 3, after the labeling process done, the connection from LED cube have been made to PIC controller circuit. By using a different color of cable it will easy to detect a problem in which port. The connection will look more structured when all of the cable is arrange. 
  • At the figure 4, after all of the cable and connection is correctly arrangement, the project will look as the picture above. 
  • At the video 1, show the main display for this project. According to the title chosen, the coding BMI display has been made. More design and feature will be finish up after this. 

PLAN FOR THE NEXT WEEK
  • To make an assemble and finish up the project design (hardware).
  • To finalize a project coding by compile the entire of programming.